A Permian Basin producer had substantial scale build-up on a problem SWD. As a result injection pressure went to 800 psi in less than 90 minutes following pump start. After pump shut down, it took over 6 hours to return to static pressure.
With JGL's Microbe Treatment, the operator experienced three specific indicators of skin damage removal, which led to greater water flow and improved injectivity.